Paver Base Calculator

Estimate the gravel base and sand bedding needed under your pavers. Use this paver base calculator to work out exactly how much crushed stone your paver base needs.

Paver Base Calculator

ft
ft
ft

Free to use • No sign-up needed

Crusher run (road base) compacts to a rock-hard layer. Compact in 2-inch lifts with a plate compactor for best results.

How to Use This Calculator

  • Measure the length and width of the paver area in feet.
  • Enter the depth of the gravel base and sand bedding in inches.
  • Choose your base material and bag size, if needed.
  • Click Calculate to see how much gravel base and sand bedding you need.

What Is a Paver Base?

A paver base is the layer of crushed stone that sits under your pavers and carries all the weight. It is the foundation of the whole project. A good base keeps pavers level for years. A bad base lets them sink, tilt and go wavy within a season or two.

The base is usually made from crusher run, also called road base or 21A. It is a mix of crushed stone from dust up to about 3/4 inch. The different sizes lock together when compacted, forming a hard, stable layer. Pea gravel and river rock do not work as a base because their smooth, round stones roll and never lock together.

How Deep Should a Paver Base Be?

Depth depends on what the pavers will carry.

  • Patio or walkway: 4 to 6 inches of compacted base.
  • Driveway: 6 to 8 inches of compacted base, because cars are far heavier than people.
  • Heavy vehicles or RV parking: 8 to 12 inches.

These depths are after compaction. Loose stone compacts down by about 20 to 30 percent, so you need to order more than the finished depth. If your soil is soft clay, add 2 inches and lay a geotextile fabric under the base to stop the stone from sinking into the mud.

How Much Base Do I Need?

One cubic yard of base material covers about 80 square feet at 4 inches deep, or about 55 square feet at 6 inches deep. A 10-by-10-foot patio with a 4-inch base needs about 1.25 cubic yards. A 10-by-20-foot driveway with a 6-inch base needs about 3.7 cubic yards.

Always add 10 percent for waste and compaction. It is better to have a little extra stone than to run short in the middle of the job. The calculator above works out the amount from your measurements, including the extra for compaction.

How to Build a Paver Base

  1. Excavate to the full depth: base depth plus 1 inch of bedding sand plus the paver thickness. Remove all grass, roots and soft soil.
  2. Lay geotextile fabric if the soil is soft or wet. It keeps the base stone from mixing into the mud below.
  3. Spread the crusher run in layers of about 2 inches. Never dump the full depth at once.
  4. Wet each layer lightly and compact it with a plate compactor. Two or three passes per layer is normal.
  5. Check the level after each layer. Fix low spots now, not after the pavers are down.
  6. Screed 1 inch of coarse bedding sand over the finished base, then lay the pavers.

The compactor is not optional. An uncompacted base settles under the first rain, and the pavers sink with it. Renting a plate compactor for a day costs far less than rebuilding a sunken patio.

Paver Base vs Bedding Sand

These are two different layers with two different jobs, and they are often confused.

  • Base: 4 to 8 inches of crusher run, compacted hard. Carries the weight.
  • Bedding sand: 1 inch of coarse sand, screeded flat but not compacted. Gives the pavers a smooth, level bed to sit on.

Sand is not a substitute for base material. A thick sand layer under pavers shifts and washes out, and the pavers sink. A thin base with a thick sand layer is the most common reason a new patio goes wavy in its first year.

Common Mistakes to Avoid

  • Using pea gravel or river rock as a base. Round stones never lock together.
  • Dumping the full base depth at once. Compact in 2-inch layers or the bottom never gets firm.
  • Skipping the plate compactor. Hand tamping is not enough for a real base.
  • Forgetting the edge restraint. Without a solid edge, pavers and base spread outward.
  • Not accounting for compaction. Order about 25 to 30 percent more loose stone than the finished depth, or about 10 percent extra by volume after the calculator’s compaction allowance.
  • Building on soft soil without fabric. The stone sinks into the mud and disappears.

Bottom Line

Dig deep enough, use crusher run, compact it in 2-inch layers, and keep the bedding sand to 1 inch. Use the calculator above to work out how much base material you need before you order.

Written by the Yard & Bag Editorial Team. Our content is researched and checked against supplier guidance and standard building practice.

Related guides: How Much Sand Do I Need for Pavers?

Frequently Asked Questions

How deep should a paver base be?

Depth depends on what the pavers will carry. A patio or walkway needs 4 to 6 inches of compacted base. A driveway needs 6 to 8 inches, because cars are far heavier than people. Heavy vehicles or RV parking need 8 to 12 inches. These depths are after compaction, and loose stone compacts down by about 20 to 30 percent, so order more than the finished depth. If your soil is soft clay, add 2 inches and lay a geotextile fabric under the base.

What material should I use for a paver base?

Crusher run, also called road base or 21A. It is a mix of crushed stone from dust up to about 3/4 inch, and the different sizes lock together when compacted into a hard, stable layer. Pea gravel and river rock do not work as a base, because their smooth, round stones roll and never lock together.

How much base material do I need?

One cubic yard of base material covers about 80 square feet at 4 inches deep, or about 55 square feet at 6 inches deep. A 10-by-10-foot patio with a 4-inch base needs about 1.25 cubic yards, and a 10-by-20-foot driveway with a 6-inch base needs about 3.7 cubic yards. Always add 10 percent for waste and compaction.

How do I build a paver base?

Excavate to the full depth: base depth plus 1 inch of bedding sand plus the paver thickness, and remove all grass, roots and soft soil. Lay geotextile fabric if the soil is soft or wet. Spread the crusher run in layers of about 2 inches, compacting each layer before adding the next. Never dump the full depth at once.

Can I use sand instead of gravel for a paver base?

No. Sand is only the 1-inch bedding layer on top of the base. The base itself must be compacted crushed stone, or the pavers will settle and go wavy. A thin base with a thick sand layer is the most common reason pavers settle.